To test the capability of the workflow between revit and visualisation, i build this small project. I features hyperbolic paraboloids, which in itself is difficult to model in revit. With the use of massing elements, and by linking the model to 3ds max it was swift to obtain a workflow where updating the visualisation along with the design was possible. The after and before image just shows the strength of 15 minutes of post processing in photoshop, and it really does a difference.